Realistically, this chap has been at this 40 foot ketch for 13 years, and has 5,000 hours in the project. It has also cost him a marriage, and he notes that his "new wife" is not a sailor but is supportive....There are people who build boats for just the pleasure of building a boat--but many months he only put in 10 to 20 hours on the boat. That way it takes a long time to get it built. Add in that the hull is only about 25% of the cost/work of a sailboat.
The traditional way to pour a keel is in a foundry sand mold. Sometimes these are bult in the ground, but often in a box, and a plug (model of the keel) is made first to get the exact contour of the keel. The sand is moulded and bound around the plug before it is removed and finall smoothing occurs. The lead is poured in one piece to avoid any cold joints, especially in a bolted on keel.
I built some 38 foot sailboats in the late 70's. They were fiberglass, and the hull took far less time than a wooden boat. I had 8,000 lbs of lead in the encapsulated keel and it was in pigs which were remelted from both wheel weights and medical radioisotope containers. The pigs were done every time I had several hundred lbs. They were stacked in the keel tightly, then lead shot was poured around them, finally polyester resin and sand smoothed off the top, along with layers of mat and roving. We fully completed a boat in 24 months. At the same shipyard there were people who had been working on a single boat as much as 20 years--and they passed on before the boat was finished.....