The flybridge was removed last week in anticipation of shipping to Norfolk in about 2 weeks. Not the nightmare I thought it would be. The only wires that had yo be cut were the cables to the fuel flow sensors that I installed 2 years ago. All other wiring to the bridge was in multiple looms that went to multiple connector plugs. The bridge was put on a skid the totally shrink wrapped. Might not be so bad to put back together. Props are off and waiting for FWC kits to be installed.