These cranes are very stable as they stand. In normal useage, the container crane's grab must be able to fully extend to the outer end of the boom, pick up a fully loaded 45' container in the 80,000 pound range from the lower bowels of a container ship, lift the container vertically to clear the other boxes stowed on the vessel and then retrack the container to shore side and lower it onto a flat rack (container trailer) and repeat the entire process every four minutes or so. The biggest concern is the rolling of the vessel during transit. A 5 degree roll radius on the deck of the heavy lift ship transmitts to a 20 degree (or larger) roll radius at the peak of the container crane. The secret is conservative weather routing. I would quess that the trip requirements issued to the master prior to departure called for the vessel to avoid seas of 6' or greater and winds in excess 30 knots. This vessel is a specialized heavy lift ship and designed to carry odd ball loads, it is not some bulk carrier with a deck load. If the master used drilling mud for ballast, he would be looking for work some where else! It's hard enough to discharge sea water ballast in port now days much less a groundup barite soup with chemicals added.