mrknowitall
Member
- Joined
- Jun 16, 2001
- RO Number
- 4979
- Messages
- 302
I need a little input regarding the proper, most durable arrangment when tied to a mooring can. It's a traditional set up with a large ring. I have 1" rope on the reinforeced deck cleat. I did two lines with the second a little loose, this is a back up just in case. My boat is about 14,000lbs. Some days a light on-shore wind. I am looking for old fire hose to be used as chaffing protection at the deck chalks. Should I bring the primary rope around the ring twice before bring in back to the deack cleat? Is there a way to reduce chaffing at the ring? I plan to leave it on the can for 6-8 weeks. Your tips and advise are appreciated in advance.