Have a 1998 Bayliner 2052 that the plywood floor has rotted out of. I have removed most of it and thus far everything underneath looks great with the exception of one stringer which I will reinforce. I plan on doing the following. Does anyone see anything wrong with anything I plan on?
-Remove remainder of floor. Clean up everything underneath and leave exposed to dry any dampness.
-cut plywood into shape.
-coat underside and edges of wood with epoxy ( a couple coats)
-epoxy the new wood in place to stringers.
-a few coats of epoxy to top side of wood.
-allow to cure and re carpet.
This floor was plywood with a layer of fiberglass....and was completely rotted through. Reading online has brought me to the decision of skipping the fiberglass and just put a few nice coats of resin on it.
Any thoughts?
-Remove remainder of floor. Clean up everything underneath and leave exposed to dry any dampness.
-cut plywood into shape.
-coat underside and edges of wood with epoxy ( a couple coats)
-epoxy the new wood in place to stringers.
-a few coats of epoxy to top side of wood.
-allow to cure and re carpet.
This floor was plywood with a layer of fiberglass....and was completely rotted through. Reading online has brought me to the decision of skipping the fiberglass and just put a few nice coats of resin on it.
Any thoughts?