Our spring project this year was to replace all of the waste lines. We noticed last year that they had started to smell a bit and after testing found that they had become permeated. Oh, well I guess they lasted 15 years. As we got into the project we also found that the original aluminum waste holding tank had a few pin size rust holes in the bottom. Rather then mess around with trying to fix the tank we went instead with a new Todd poly tank. They made an perfect size for our boat being that the old tank had to be cut out with a sawzall, not messy at all to do which I was very surprised at.
Overall the project went very well. Working in between nice days and rain days the project took us about a two weeks. The first obstacle was learning how to gain access to the aft cabin side wall. Even though we are not the original owners, I called Crownline and their service manager Jim Duff was kind enough to walk me through the process of removing the various panels to open up the access.
As you can see by the pictures, after 15 years of use the bilge paint has taken a beating. I decided to give it a fresh coat of BilgeKoat gray to spruce it up.
And to close out, the best part of the project was having my admiral help in the process. Being only 4' 11" she was able to squeeze into the engine compartment and handle removing and installing the waste vent line and pumpout line. I think she was pretty pleased to have helped. For the assistance I'll let her be the first to fill the new tank, unless we sell the boat first. We are in the process of selling so we can move up to a 35'. I figured whoever may end up with our boat would appreciate the fresh tank and lines. A very well spent $200 bucks.
Enjoy the photos.
Old Lines
Old Lines
Old Tank
Old Tank Location
Engine Area Before Paint
New Tank Installed
Tanks and batteries all back in.
Other side of the engine compartment
Removing old lines before safety classes
Joys of being tiny
Thank you honey.
Overall the project went very well. Working in between nice days and rain days the project took us about a two weeks. The first obstacle was learning how to gain access to the aft cabin side wall. Even though we are not the original owners, I called Crownline and their service manager Jim Duff was kind enough to walk me through the process of removing the various panels to open up the access.
As you can see by the pictures, after 15 years of use the bilge paint has taken a beating. I decided to give it a fresh coat of BilgeKoat gray to spruce it up.
And to close out, the best part of the project was having my admiral help in the process. Being only 4' 11" she was able to squeeze into the engine compartment and handle removing and installing the waste vent line and pumpout line. I think she was pretty pleased to have helped. For the assistance I'll let her be the first to fill the new tank, unless we sell the boat first. We are in the process of selling so we can move up to a 35'. I figured whoever may end up with our boat would appreciate the fresh tank and lines. A very well spent $200 bucks.
Enjoy the photos.
Old Lines
Old Lines
Old Tank
Old Tank Location
Engine Area Before Paint
New Tank Installed
Tanks and batteries all back in.
Other side of the engine compartment
Removing old lines before safety classes
Joys of being tiny
Thank you honey.