Our spring project this year was to replace all of the waste lines. We noticed last year that they had started to smell a bit and after testing found that they had become permeated. Oh, well I guess they lasted 15 years. As we got into the project we also found that the original aluminum waste holding tank had a few pin size rust holes in the bottom. Rather then mess around with trying to fix the tank we went instead with a new Todd poly tank. They made an perfect size for our boat being that the old tank had to be cut out with a sawzall, not messy at all to do which I was very surprised at.

Overall the project went very well. Working in between nice days and rain days the project took us about a two weeks. The first obstacle was learning how to gain access to the aft cabin side wall. Even though we are not the original owners, I called Crownline and their service manager Jim Duff was kind enough to walk me through the process of removing the various panels to open up the access.

As you can see by the pictures, after 15 years of use the bilge paint has taken a beating. I decided to give it a fresh coat of BilgeKoat gray to spruce it up.

And to close out, the best part of the project was having my admiral help in the process. Being only 4' 11" she was able to squeeze into the engine compartment and handle removing and installing the waste vent line and pumpout line. I think she was pretty pleased to have helped. For the assistance I'll let her be the first to fill the new tank, unless we sell the boat first. We are in the process of selling so we can move up to a 35'. I figured whoever may end up with our boat would appreciate the fresh tank and lines. A very well spent $200 bucks.

Enjoy the photos.

Old Lines

Lines2.jpg


Old Lines

Lines3.jpg


Old Tank

tank1.JPG


Old Tank Location

tank2.JPG


Engine Area Before Paint

tank3.JPG


New Tank Installed

NewTank.JPG


Tanks and batteries all back in.

NewTank2.JPG


Other side of the engine compartment

Bilge1.JPG


Removing old lines before safety classes

Jacki2.JPG


Joys of being tiny

Jacki3.JPG


Thank you honey.

Jacki1.JPG
 
The expression on her face tells a story. You may have had one more favor to ask....mayby one!
 
Bravo ! Very nice finished project and all the money you saved doing it yourself.
 
Great looking job! The only thing I noticed is that you did not double clamp all hoses, just my opinion.
 
Wow, that came out great.

I can't believe your wife was willing to go down in the bilge. I don't ever see that happening on my side. :)
 
I, too, have a pocket-sized wife capable and willing to perform similar jobs... she gets well-paid for her troubles though. [^]
 